loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

About the working process and precautions of powder tablet press

The working process of the powder tablet press can be divided into the following steps: 1. The punch part of the lower punch (its working position faces upward) extends from the lower end of the middle die hole into the middle die hole to seal the bottom of the middle die hole; 2. Use the feeder to fill the middle die hole with medicine; 3. The punch part of the upper punch (its working position faces down) falls from the upper end of the middle die hole into the middle die hole, and moves down a certain stroke to press the powder into tablets; 4. , The upper punch is lifted out of the hole. The lower punch rises to push the tablet out of the middle die hole, completing a tablet pressing process; 5. The lower punch falls to the original position, ready for the next filling. Precautions for powder tablet press: 1. In order to prevent oil leakage during transportation, the oil hole screws are tightly tightened, but the oil pool is well sealed so that the oil cylinder cannot absorb hydraulic oil and cannot be pressed normally. During normal use, the screws need to be loosened a little; 2. When pressurizing, pay attention that all the threads of the lead screw must enter the upper plate, and not just connect a few buttons. Prevent thread deformation of the lead screw; 3. Regularly add lubricating oil to the lead screw. Prevent the rust of the lead screw from affecting the use; 4. The pressurization must not exceed the pressure range of the machine, otherwise danger will occur; 5. It is advisable to use clean No. 46 anti-wear hydraulic oil; 6. The manual pressure handle is strong when pressurized , but the pressure gauge has no indication, unload and check the pressure gauge immediately; 7. When the machine is new or has not been used for a long period of time, slightly tighten the oil drain valve when it is used, and unload when it is pressurized to 5-10MPa, and repeat continuously 2-3 times, it can be used normally; 8. The large piston should not exceed the specified stroke, otherwise the tension spring will be deformed, and the oil cylinder cannot return to the initial position; Block the low-pressure valve port with your hands, shake the pressure handle, and the oil will flow out from there. When the oil that cannot block the valve with your hands comes out, tighten the screws;

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect