loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

×
Air Shower Installation Video-1

Air Shower Installation Video-1

first step, Find the air shower base,

Air Shower Installation Video-1

first step,

Find the air shower base,

set up,

The second step,

Find the right side of the air shower

move the right side,

put in the corresponding position

open the right side,

Lower return air vent cover

move the right side,

Use 6 angle screws with the bottom,

linked together.

Hexagon screw connection,

We have drilled and positioned,

You can directly correspond to the hole link.

After the link on the right is completed,

Also find the left side,

Note (with combination lock on the left, control panel)

After you find it, you can also link it at the bottom.

Suzhou Pharma Machinery Co.,Ltd.

2022/06/17

Kevin


If you have more questions, write to us
Just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs!
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect