Step 1: color steel panel coating
This layer of film is to reduce the scratches on the paint surface of the color coated plate during later production, transportation and installation, and has achieved the overall aesthetic effect.
Step 2: profiled cutting of color steel panel
According to the size of the finished clean board required by the customer, cut the color coated board that has been coated with film.
Step 3: manually glue the color steel panel
The advantage of clean board is that the production process is completed manually from this step. The advantage of manual glue homogenization is that the glue is more uniform and the adhesion will be better.
Step 4: install structural frame keel
The keel plays a supporting role
Step 5: lay rock wool
The glass wool is evenly cut and laid on the glass wool board by hand.
Step 6: lay uniform glue glass magnesium plate and color coated plate
The glass magnesium plate and color coated plate coated with glue by hand are laid on the cut rock wool and compacted
Step 7: compaction
The finished products must be compacted for 48 hours before they can leave the factory