Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.
1. Removal of the middle mold platen: Pull out the powder baffle, remove the hopper, unscrew the feeder set screw, unscrew the feeder fixing stud and spring, remove the feeder, unscrew the middle mold platen fixing screw and spring The gasket can be removed to remove the middle mold platen. Installation: Refer to the above in reverse order. Pay attention to the alignment when screwing on the fastening screws of the feeder. So as not to damage the wire hole of the feeder. 2. Removal of the upper punch: loosen the lock nut of the connecting rod, turn the upper punch to separate it from the connecting rod, turn the hand wheel to raise the eccentric wheel housing to the position, turn the eccentric connecting housing to make the connecting rod swing to the front