The construction of the purification pharmaceutical cleanroom needs to pursue the rigor of the project in the design and construction process to ensure the actual operation performance of the construction. Therefore, some basic factors need to be paid attention to in the construction and decoration process.

One: Pay attention to the design requirements of the ceiling

In the construction process, attention should be paid to the design of the indoor ceiling. The suspended ceiling is a designed system. The suspended ceiling is divided into two types: dry and wet. The dry ceiling is mainly used for the efficiency filter fan system, and the wet system is used for the return air conditioning box with the efficiency filter air outlet system. Therefore, the ceiling must be sealed with sealant.

Two: Pay attention to the main points of the pipeline

The design of the air duct should meet the requirements of quick, easy, reliable and flexible installation. The air outlet, air volume control valve and fire damper in the purification pharmaceutical cleanroom are all made of well-shaped products, and the joints of the plates should be sealed with glue. In addition, the air duct should be disassembled at the installation site, so that the main air duct of the system remains closed after the installation is completed.

Three: Key points of indoor wiring installation

Indoor low-voltage piping wiring should pay attention to the inspection of the correct pre-embedding in the early stage of the project with the civil construction according to the drawing, and there should be no folds and cracks at the bend of the electric pipe during piping, so as to avoid affecting the indoor operation. Except, after the indoor circuit is installed, the circuit should be carefully inspected and various insulation and grounding resistance tests should be done.

At the same time, the construction of the purification workshop should be carried out in strict accordance with the construction plan and relevant specifications. In addition, the construction personnel should pay attention to the random inspection and testing of the incoming materials according to the regulations, and can only be implemented after meeting the relevant application requirements.

SUZHOU PHARMA MACHINERY CO.,LTD.'s products, whether interim or permanent, comply fully with all appropriate producing regulations.

Deliver value to our customers by providing the most reliable and efficient products as CUSTOM SOLUTION SERVICES.

Individuals with varied technical skills use CUSTOM SOLUTION SERVICES in a wide range of applications.

SUZHOU PHARMA MACHINERY CO.,LTD. are trained to think about problems and coming up with solutions, as well as presenting the whole idea in a logical and coherent manner.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect