loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

×
How To Use The Transfer Window

How To Use The Transfer Window

The transfer window shall be managed according to the cleanliness level of the higher level clean area connected with it.

The transfer window shall be managed according to the cleanliness level of the higher level clean area connected with it. For example, the transfer window connected between the code spraying room and the filling room shall be managed according to the requirements of the filling room. After work, the operator in the clean area shall be responsible for wiping the internal surfaces of the transfer window and turning on the ultraviolet sterilization lamp for 30 minutes.

1. Materials entering and leaving the clean area must be strictly separated from the pedestrian passage, and shall be passed through the special passage for materials in the production workshop.

2 When materials enter, the process leader of the preparation team shall organize personnel to unpack or clean the appearance of raw and auxiliary materials, and then send them to the temporary storage room of raw and auxiliary materials in the workshop through the transfer window; The inner package materials are removed from the outer temporary storage room and sent to the inner package room through the transfer window. The workshop comprehensive personnel shall handle the material handover with the person in charge of the preparation and inner packaging process.

3 When passing through the transfer window, the provisions of "one open and one close" for the internal and external doors of the transfer window must be strictly followed, and two doors cannot be opened at the same time. Open the outer door to put the materials in and then close the door. Open the inner door to take the materials out and close the door.

4 When the materials in the clean area are sent out, the materials should be transported to the relevant intermediate material station first, and moved out of the clean area according to the reverse procedure when the materials enter.

5 All semi-finished products are transported out of the clean area from the transfer window to the external temporary storage room, and then transferred to the external packaging room through the logistics channel.

6 The materials and wastes that are easy to cause pollution shall be transported to the non clean area from the special transfer window.

7 After the materials are transported in and out, the site and transfer window of each clearing room or intermediate station shall be cleaned in time, the internal and external passage doors of the transfer window shall be closed, and the cleaning and disinfection work shall be done well.

Suzhou Pharma Machinery Co.,Ltd.

2022/09/28

Alice


If you have more questions, write to us
Just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs!
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect