loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Installation process requirements for color steel wall panels in purification workshops

Installation process requirements for color steel wall panels in purification workshops

When installing the color steel plate in the purification pharmaceutical cleanroom, according to the positioning ink line, install the aluminum alloy groove aluminum, and fix it from the door opening first, because the aluminum alloy single groove should be assembled diagonally or spliced u200bu200bwith the door frame material, and the distance between the door should be ensured. Accurate, otherwise it will cause lax seams,...

Text label: purification workshop wall panel installation, color steel plate installation process, Zhongjing Global Purification

Technical requirements for installation of color steel plate wall panels in purification workshops

When installing the color steel plate in the purification pharmaceutical cleanroom, according to the positioning ink line, install the aluminum alloy groove aluminum, and fix it from the door opening first, because the aluminum alloy single groove should be assembled diagonally or spliced u200bu200bwith the door frame material, and the distance between the door should be ensured. Accurate, otherwise it will cause lax joints, affect the appearance and be easy to accumulate dust; the installation of ground groove aluminum should be carried out after all the ground positioning lines are drawn and checked accurately, which can avoid damage to materials caused by wrong installation and rework. As for whether the ground groove aluminum is cut, it depends on the material of the door frame used. If a factory-made metal door is used, the groove aluminum at the door frame is not cut. Corners can be cut or not. When installing the aluminum slot on the ground, you can use an electric hammer to drill holes on the ground. When drilling, even the aluminum slot will be drilled. This will make the construction speed fast and the positioning accurate; the installation of the slot aluminum must be accurate, and any error will directly affect the wall panel. Installation quality, the purpose of applying sealant under the aluminum slot is to prevent water or other liquids from flowing into the adjacent room through the gap of the aluminum slot at the lower part of the partition wall of the color steel sandwich panel during use. If epoxy resin self-leveling is used as the ground Or use PVC coil material as the ground, do not apply sealant under the aluminum groove, and the self-leveling material can seal the gap.

Before installing the wall panel, you should carefully check which board has air return holes. These holes should be opened before assembly. When installing the wall panel, put the lower end of the wall panel into the aluminum slot on the ground, and tilt the panel when placing it. Place the corners first, and then adjust them in place at the end; the wall panel assembly should start from the wall panel against the civil exterior wall, and the verticality needs to be corrected for each panel installed, otherwise the joints will be uneven; if the wall panel is found to be not vertical, For the flat ground, the method of pad can be used for correction. If the flatness of the ground is poor, it is difficult to use the method of pad. In this case, the slot aluminum on the ground can be used to adjust the height; It should be fixed with the hidden place of the adjacent wall panel in time. The fixing position is in the groove at the joint at the top of the wall panel. The fixing method is to use 4mm*16mm self-tapping screws to fix the 10mm*10mm small slot aluminum at the joint. In the groove, this method is also used to fix the orthogonal wallboard. The 10mm*10mm small slot aluminum can be folded into 90°. When installing the wallboard, temporary protection measures should be taken to prevent the wallboard from falling. The installation of the intersecting wall panels should be based on the ground slot aluminum at the intersection, and the vertical line should be drawn upward to determine the installation position of the slot aluminum at the intersection. The slot aluminum should be kept vertical to ensure the verticality of the intersecting wall panels; Then, fix it with 4mm*16mm blind rivets or self-tapping screws, and put the intersecting wall panels into the wall groove aluminum. When installing, tilt the board first, so that the two corners of the board are put into the ground groove aluminum and the wall panel groove respectively. Aluminum, and then slowly push the board upright to put it in, and then gently push the wall board in the direction of the cross board to make it all put into the wall board slot aluminum. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for purification workshops and purification plants.

Special hanging parts are used for hanging the handmade color steel sandwich panel. The position of the hanging point is considered as a whole according to the length of the board and the position of the air supply port. When the hole is cut, it should be supported with a brace at the bottom. After the hole is cut, it should be wrapped with aluminum groove and the high-efficiency air outlet should be hoisted in place, so that the high-efficiency air outlet can also play an auxiliary role in hanging the ceiling; after the ceiling is installed, first use glue Seal the joints on the upper part of the roof, otherwise dust will fall into the seams and affect subsequent sealing; after the wall and roof are installed, the arc corner base can be installed, and the arc corner base can fix the ceiling plate and the wall plate. Self-tapping screws can be used to fix the base, and the spacing is about 200mm.

The use and installation of CUSTOM SOLUTION SERVICES is compared with most other systems for managing the extraction machine effectively and no doubt CUSTOM SOLUTION SERVICES have won the race so many times.

We are a provider of a various number of services that include . Search our website by CUSTOM SOLUTION SERVICES extraction machine product line or category to find what you are looking for.

There is growing awareness about the health benefits of among the consumers resulting in its increasing popularity.

PHARMA is designed to enhance your savings in terms of cost, energy and efforts.If you are interested in our CUSTOM SOLUTION SERVICES extraction machine products, please contact us soon.

The only cardinal rule with adding animation is to keep high-quality on CUSTOM SOLUTION SERVICES.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect