Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.
1. Die installation (1) Install the upper punch: Loosen the fixing screw of the lower punch, turn the hand wheel to raise the lower punch to the position, insert the lower punch into the hole of the lower punch (note that the notch of the lower punch faces the The lower punch fastening screw must be inserted to the bottom) Tighten the lower punch fixing nail. 2. Install the lower punch: loosen the fastening nut of the upper punch, and put the upper punch