Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.
1. Regularly check the machine parts, 1-2 times a month. The inspection items are whether the worm gear, worm, bearing, pressure wheel, crankshaft, upper and lower guide rails and other moving parts are flexible and wearable. If any defects are found, they should be repaired and used in time. 2. After one-time use or shutdown, the remaining powder should be taken out, and the residual powder on the machine name part should be cleaned. If the shutdown time is long, all the dies must be removed, and the machine must be wiped clean. The smooth surface of the machine Apply anti-rust oil and cover with cloth.