Service:Video technical support, Online support, Field maintenance ,repair service
Warranty:1 year
Certification:CE ISO GMP
Usage:Hospital/Pharmacy/Medical/workshop
Floor:clean room PVC 2mm Homogeneous floor
Lighting:LED (CE UL)
Clean grade:From Class100-100000
Name:modular clean room
Power Supply:AC 100~240V 1 phase,AC 220~480V 3 phase
Type:Vertical Air Flow,horizontal Air Flow
Limit Discounts
Description
The modular clean room uses a uniform size board, and non-standard sizes can also be customized and designed in accordance with GMP clean room standards. The building materials of GMP clean room meet the acceptance standards of GMP clean room. It can be installed quickly and easily. The installation time for 20-40 square meters is generally 2-3 days, the installation time for projects of 50 square meters is generally 3-8 days, and the installation time for projects of 100 square meters and above is generally 10-15 days. We provide complete clean room construction drawings, installation process drawings and online installation and commissioning instructions. We provide professional and efficient clean room design services and deliver engineering solutions quickly.
We have rich experience in exporting clean room transportation and a professional team. Every year, an average of more than 50PCS 40-foot high containers are transported to countries around the world. We are a very professional supplier and manufacturer in China. Our company has completed more than 500 clean room projects all over the world.
Can help you quickly complete customs clearance and safely deliver the goods to you. You are welcome to inquire about purchasing our company’s clean room projects and other products 24 hours a day.
The best-selling multi-environment clean room on the market
The modular clean room adopts uniform size plates, and different sizes of plates can also be customized, which can be customized according to the actual size you need. The building materials of the GMP clean room meet the acceptance standards of the GMP clean room. The clean room engineering installation is convenient and easy to operate. We can provide complete construction drawings, installation process drawings and online installation, commissioning and guidance. The engineering work can be completed smoothly without professional personnel under our guidance, which is convenient and quick.
Characteristics 1 MOQ is 3*2*2m size of the room,ready to shipping in 3 working days. 2 Design scheme of GMP clean room specialty. 3 Custom export wooden packing, fast customs clearance 4 Professional Installation Drawings, Online Technical Installation Guidance 5. Customers can customize HVAC to realize air supply, return and fresh air duct system |
Technical Parameters
Cleanliness | Class 100 to Class 100000, ISO 5 to ISO 8, Class B to Class D |
Project include | 1. Structure: Wall Panel, Ceiling Panel, Windows, Doors, Various Fittings, Flooring |
2.Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc | |
3.HVAC: AHU, Ducting, Piping, Chiller, dehumidifier, etc. | |
4.Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Panel | |
5. Process Piping System: Gas, Water Pipeline | |
Temperature&Humidity | As clients request |
Application | Pharmaceutical industry, workshop, food factory, medical, biological laboratory, chemical workshop, plant seed |
Qualification Documents | ISO,CE |
Our Service | Professional consultation, friendly English, good reputation, guaranteed, 24-hour technical support, foreign installation and debugging |
Installation
In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!
How to get a quotation >>