Precautions for installation and construction of laboratory equipment
After the laboratory furniture is installed, check all the openings on the outside of the laboratory table, and plug them with appropriate hole plugs; the panel of the laboratory table should be kept as intact as possible, and contact should be minimized, and no vertical Combination of methods; check the position of water, electricity, gas and air ducts...
Text label: laboratory equipment, pharma machinery purification engineering, installation and construction precautions
Precautions for installation and construction of laboratory equipment
After the laboratory furniture is installed, check all the openings on the outside of the laboratory table, and plug them with appropriate hole plugs; the panel of the laboratory table should be kept as intact as possible, and contact should be minimized, and no vertical Combination of methods; check whether the positions and interfaces of water, electricity, gas and air ducts deviate from the design, and timely feedback the information, communicate with them, and determine the final solution; all cabinets on the same test bench are installed at the installation position. Adjusted on the same level, after the level adjustment is completed, the gap between the base cabinet and the base cabinet is required to be no more than 1mm, and the upper and lower error of the seam should not exceed 0.5mm; if all the base cabinets need to be connected into one, it must be adjusted. After connecting, the joints must be uniform and tight, the distance between the joints should not exceed 0.7mm, and the error size of the upper and lower joints should not exceed 0.5mm.
After the pipeline is installed, place the countertop on the base cabinet. The distance between the joint between the countertop and the countertop should not exceed 2mm, and the error of the distance between the two ends of the joint should not exceed 0.5mm. Check whether the countertop is bent or disguised. If the countertop is slightly deformed, Add rubber gaskets to the gaps to ensure stable installation of the table; when installing the table, if there is a protective film on the table, the protective film must be removed after the installation is completed and before acceptance; do not put sharp metals, tools and things of the same substance on the On the countertop, during construction, do not tear off the countertop protective film; if people must step on the countertop during work, they must do a good job of protecting the countertop and furniture; products, accessories, and tools should be clearly distinguished, and it is strictly forbidden to mix various materials, accessories, and products. , the site is kept clean at all times, and accessories are strictly prohibited from being seen anywhere; the installation site inspection, the overall inspection after the installation is completed, the inspection standards include the installation site management regulations, laboratory floor plans, and single-piece three-dimensional renderings. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for laboratories and clean rooms.
Cabinet installation inspection, the installation position of the cabinet is correct and fastened, the cabinet body is vertical and flat, the allowable verticality error is below 0.5mm, the gap of the door panel is uniform, the allowable error is below 0.5mm, the front is flat, no height Uneven phenomenon; all visible surfaces are free of bumps and scratches, the movable laminates are neatly arranged, and the interior of the cabinet is thoroughly cleaned without residual dust and debris. Pipeline slot installation inspection, the installation position is correct, consistent with the drawing, the connection is straight, no dislocation phenomenon, the cable slot cover is installed flat, firm, and has no distortion and deformation; the surface of the pipeline slot is free of bumps and scratches. Switches and power sockets are inspected. The installation position is correct and consistent with the drawings. The sockets are installed completely without missing covers, missing corners, missing edges and surface scratches; whether they are installed horizontally or vertically, they should be installed horizontally and vertically without skewing. The power cord is inserted firmly, and there is no looseness or looseness. Faucet installation inspection, the installation position is correct, meets the design requirements of the drawings, the installation is tight, there is no loosening, shaking, and skewing, the surface is clean, no scratches, no scars, no water pipes are tightly joined, and no water seepage and leakage. Filled with glass glue, the gap filling of the table is uniform and uniform, without the phenomenon of different depths and sizes, and the amount of other gap filling glue is moderate, and there is no overflowing surface and bending phenomenon.
There are many issues that affect extraction machine, which has led to the need of getting specialists trained in certain areas so as to handle all issues that may arise as well as CUSTOM SOLUTION SERVICES products that can solve extraction machine problems.
Best in SUZHOU PHARMA MACHINERY CO.,LTD. can handle all sorts of extraction machine with good efficiency while providing ensured quality. Here you can find so as to solve your extraction machine issues.Go to PHARMA MACHINERY to get fixed.
SUZHOU PHARMA MACHINERY CO.,LTD. integrates research streams on team diversity and knowledge boundaries, and present a framework that considers the kinds of specific knowledge boundaries that must be spanned to achieve high-level, cross-boundary teaming.
There are different types of , mainly extraction machine and extraction machine.
With so many suggestions and tips on diferent solutions to extraction machine issues, it is truly important to know how to find the most appropriate CUSTOM SOLUTION SERVICES at economical price.