Preparation cleaning engineering layout design

Preparation cleaning engineering layout design

The preparation cleaning project has a reasonable functional division and an overall layout to avoid pollution, generally including the main production workshop, auxiliary production workshop, warehouse, power, public works, environmental protection facilities, overall management facilities and living facilities, transportation road facilities ; Generally, it is distributed in the center of the factory...

Text label: preparation workshop cleaning engineering, cleaning engineering design and installation, preparation cleaning engineering layout

Preparation cleaning engineering layout design

The preparation cleaning project has a reasonable functional division and an overall layout to avoid pollution, generally including the main production pharmaceutical cleanroom, auxiliary production workshop, warehouse, power, public works, environmental protection facilities, overall management facilities and living facilities, transportation road facilities ; Generally, the main production area is arranged in the center of the factory area, and the auxiliary workshops are arranged nearby; the workshops with similar production properties or related technological processes should be arranged close or concentrated; the production workshop should consider the process characteristics and cross-infection during production; Quality inspection, canteen, warehouse, and auxiliary living areas are arranged in the front area of u200bu200bthe factory, and are located on the windward side of the dominant wind direction throughout the year or on the downwind side of the minimum frequency wind direction throughout the year; garages, warehouses, yards, etc. are arranged at the freight entrances and exits adjacent to the production area and near the main road, the intersection of people and logistics should be avoided, and the transportation inside and outside the factory area should be short, fast and straight; serious air noise and electrical pollution sources such as boiler rooms, refrigeration stations, machine repair, water stations, and power distribution should be arranged on the downwind side of the dominant wind direction in the factory area. .

Centralized arrangement of workshops or merging of workshops is one of the effective measures to improve the building factor and land utilization factor. For example, water injection workshops and large infusion workshops with similar production properties have similar requirements for cleanliness, sanitation and fire prevention, and can be combined in one building Internal layered production, solid preparations such as tablets, capsules, powders and other solid preparations have similar projects, which can be combined for production on one floor by category; buildings and structures should be combined as far as possible as long as they meet the requirements of GMP standards and are technically and economically reasonable. . Master the principle of separation of people and goods. At the personnel entrance and logistics entrance of the factory, it is best to arrange the direction of personnel and goods flow in the opposite direction, and separate the freight entrance and exit from the main entrance and exit of the factory to eliminate the intersection of each other; warehouses with large freight volumes, The yard should be arranged close to the freight gate, and the entrance and exit of the goods in the workshop should be separated from the foyer to avoid crossover; under the premise of preventing pollution, the traffic lines of personnel and logistics should be as straight, short, and smooth as possible to avoid intersection and overlap; production load The center is close to the water, electricity, gas, and cold supply sources, and has a smooth and short production line, so that the conveying distance of various materials is small, reducing the conveying distance and loss of the medium; the distance between the storage area of u200bu200braw materials and the finished product and the production area should be Make it as short as possible to reduce pollution on the way. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for clean workshops and clean projects.

The engineering pipelines involved mainly include upper and lower water pipelines, heat pipelines, compressed air pipelines, refrigeration pipelines, power pipelines and material pipelines for production and living, as well as communication, lighting, power, etc. Cables and wires generally require mutual coordination between pipelines, between pipelines and buildings and structures, to facilitate construction, safe production, and easy maintenance.

Finding a reliable solution for the CUSTOM SOLUTION SERVICES extraction machine not only supports operation of the entire system but also enhance the beauty of your workplace.

During SUZHOU PHARMA MACHINERY CO.,LTD.’s existence in a market we didn’t receive any negative feedback from our customers.

The proprietor has many years experience in providing promotion services and is a sought after expert in CUSTOM SOLUTION SERVICES.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect