Purification engineering pipeline organization, pipeline laying
A large number of industrial pipelines of wind, water, various gases, various electrical circuits and other systems are often laid in the purification engineering workshop, which are crisscrossed and densely distributed in various parts of the clean building. , The convenience and safety of production and use...
Text label: purification engineering design, purification engineering company, pipeline organization and laying
Purification engineering pipeline organization, pipeline laying
A large number of industrial pipelines of wind, water, various gases, various electrical circuits and other systems are often laid in the purification engineering pharmaceutical cleanroom, which are crisscrossed and densely distributed in various parts of the clean building. , the convenience and safety of production and use, the impact on the air flow of the clean workshop, and the convenience of maintenance are carefully and comprehensively arranged; in the overall design stage, the laying of pipelines is arranged in an overall manner, and different degrees of concealment measures are adopted. The location of the purification air-conditioning room, the division of the purification air-conditioning system, and the airflow pattern determine the layout plan; there are usually many supply and return air pipes connected between the clean workshop and the purification air-conditioning unit or the machine room. Study the machine room and the clean production area In fact, the direction and concealment method of the supply and return air main pipes must be considered at the same time; when the machine room and the clean production area are located on the same floor, the air pipes or air ducts connecting the two are generally horizontal. , if it is not on the same floor, vertical air ducts need to be added.
The air flow pattern of the clean pharmaceutical cleanroom is different, and the building plane and section layout are also different. For the non-unidirectional flow clean workshop, the air supply generally has upward, upper side or side delivery; The lower side return or the side return, when the upper and lower return method is adopted, the horizontal supply and return air ducts including the air outlet must be arranged above the ceiling and below the floor of the clean pharmaceutical cleanroom. There are many vertical one-way flows. Generally, the ceiling is covered with high-efficiency filters. Above the ceiling, a large air duct or a static pressure box for air supply needs to be laid in a large space. In the lower part of the clean room, a return air grille floor should usually be installed. Generally, there is a lower technical interlayer as a return air static pressure box. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for purification projects and clean workshops.
The water system is divided into pressure pipelines, gravity pipelines and fire pipelines. The pressure pipelines include general tap water, softened water for cooling process equipment, pure water for production, ultrapure water and water for injection in factories. There are pipeline concealment requirements in the factory building, so the characteristics of its wiring are often that after entering the factory building from the main entrance, it is first introduced into the space above the ceiling or the technical interlayer for horizontal wiring, and then connected to the point of use; especially the pure water part, which is in the maintenance Purity requirements, the main pipe in the workshop forms a circulating network, and then the branch line enters the post-processing device or directly to the point of use; although the ultrapure water and injection water pipelines are pressure pipelines, in order to prevent the growth of microorganisms, blind pipes should be avoided. The layout of the pipeline should consider the surrounding space to facilitate the installation, cleaning, pressure testing and maintenance of the pipeline.
In order to purify the production environment, the pipelines laid in the clean workshop should be concealed to varying degrees, but how to master the size in actual engineering to achieve practical and economical purposes is still a problem that needs to be taken seriously for different objects ; It is generally considered that horizontal laying of pipelines, especially main pipes with large cross-sections, has obvious disadvantages in terms of dust accumulation, blocking airflow and lighting, and affecting viewing. Some vertical pipelines leading to terminal devices or process equipment along the wall , it will also accumulate dust and hinder cleaning. Usually, they are hidden in the horizontal technical interlayer and the vertical interlayer respectively, and the effect is better; when the clean workshop is equipped with a technical interlayer, the gravity drainage pipe, waste gas pipe, and some electrical pipelines can be installed. Arranged in the technical mezzanine.
Given the important role played by in ensuring proper functioning of extraction machine, every individual must take an interest towards improving extraction machine.
We are a provider of a various number of services that include . Search our website by CUSTOM SOLUTION SERVICES extraction machine product line or category to find what you are looking for.
What SUZHOU PHARMA MACHINERY CO.,LTD. discovered was that innovation occurs when business models match up with one or more of the CUSTOM SOLUTION SERVICES where technological advances overlap with market needs, thus resulting in growth and transformation.
Our commitment to equal employment and diversity is a global one as we serve customers and employ people around the world. SUZHOU PHARMA MACHINERY CO.,LTD. finds it as a business imperative that is essential to thriving in a competitive global marketplace.
Now that SUZHOU PHARMA MACHINERY CO.,LTD. has become a leader in the space and have been able to scale appropriately, we are ready to expand to other cities.