Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.
Last week, we reopened the delivery work. The container trucks can successfully arrive at our factory for loading, and the shipping port can also work normally. This time we sent three 40 foot containers of goods to our customers. Although it took a lot of time to produce goods and arrange transportation, we still sent all the goods. Before delivery, we tested the air conditioner in the factory, and checked and counted all the installation materials to ensure that the quality of the equipment and the quantity of all materials are correct. In this way, many problems can be reduced at the customer's side, and the installation work can save a lot of time and energy I hope the customer can receive the goods smoothly, and then we will carry out installation and commissioning together, so that the project can be completed and put into use as soon as possible This week, we are preparing to send the next batch of 3 containers of goods. We look forward to the smooth delivery as soon as possible.
Suzhou Pharma Machinery Co.,Ltd.
2022/05/10
Gino