Construction conditions
The clean room china does not use wood materials and other materials that do not meet the requirements of clean standards. All approach materials should be stored in an enclosed, clean and dry environment. The thickness, size and quality of the panel used in the construction of the clean room must meet the design requirements or contract requirements; Auxiliary materials such as hardware standard parts, as well as the material and specifications of the connecting steel must also meet the design requirements or contract requirements.
Cleanroom construction project details
1. lofting: firstly determine the vertical and horizontal axis reference line according to the drawing, and check whether the size of the civil structure is inconsistent with the drawing. According to the drawing, determine the location, distance, specifications of each door and window and mark the direction of opening the door.
2. the installation of the bottom slot of the partition wall
The aluminum base must be close to the ground. The aluminum alloy bottom groove aluminum must be cut according to the actual length of the wire, and then paste waterproof double-sided tape, shall not paste double-sided tape after cutting.
The base is 0.3 meters apart, and the middle of the table is fixed on the ground with plastic expansion and galvanized self-tapping screws.
Determine the length of the corner of the bottom groove to facilitate the installation of the outer corner.
3. the hole opening
Large holes such as high-efficiency air supply port installation holes, return air pipe ports, and equipment perforations on the top plate should be reserved when the color plate is processed. Open small holes on site. Mark before opening holes.
With the profile cutting machine, open holes in the lofting position to prevent deviation.
4. installation of special purification equipment
When installing small equipment for purification such as pass boxes and differential pressure meters, the opening size should be appropriate, the gap should be uniform, and the levelness and verticality meet the requirements. After the transfer window is installed, round corners must be decorated around it. The joint between the equipment and the color plate must be sealed with a neutral weather resistant sealant.
The differential pressure meter should be concealed, and the thermometer should be openly installed. Other equipment can be determined as required. Other such as production equipment needs to be installed on the envelope or through the envelope, the hole size should be accurate, the regular hole with groove aluminum sealing, the four corners are connected at a 45 degree Angle.
When installing all the equipment to pass through the color plate, it is necessary to consider and reserve the operation and maintenance space of the equipment.