The design and production of clean workshops have very high professional and technical requirements. The decoration construction requires very high construction standards and standardized decoration processes to control the relevant environment, personnel and pharma machinery, and strictly control the quality of the entire decoration production process according to the process. , then what are the main construction processes of the clean pharmaceutical cleanroom? 1. Construction of color steel plates: 1. Ceiling construction and installation process: site preparation→measurement and lay-out→support and hanger installation→ceiling plate keel installation and adjustment→ceiling installation, guard installation→air vent, lamp base plate installation→lamp installation→ Tear off film, clean and glue → air blow cleaning → high efficiency filter installation Installation → film tearing, cleaning, gluing → air blow cleaning → return air louver installation 3. During the actual construction process, the film tearing, cleaning and gluing must be carried out simultaneously after the ceiling and wall panels are installed. Generally, before tearing off the film, a comprehensive inspection should be carried out for the construction of various indoor professions, including the installation of air conditioners, the installation of various pipelines, the installation of doors and windows, and the construction and installation of related technical facilities. Check whether they meet the requirements, and make inspection records. 4. Installation of ceiling hanging parts: 1) Determine the hanging points of the hanging bars and the floor slab. Calculate the size of the hanging bars (made of round steel) used according to all the determined hanging points, and determine the main keel ( C-shaped steel) to ensure that the ceiling load meets the specification requirements Vertical, not falling off, the main keel and T-shaped keel are installed horizontally It is a prefabricated military building board, which can be short but not long, narrow but not wide. Form a large noodle with small pieces and survive at one time. Only by ensuring the accurate position of each board can ensure the quality of all board installation and the installation quality of spare parts. b: Reliable connection: The connection between the color steel plate and the ceiling keel, the connection between the plate and the plate, and the connection between the plate and the accessories are the main links to ensure the safe use of the plate. Every connection must be carefully completed to ensure overall reliability. c: Sealing and leak-proofing: The ceiling composed of panels must ensure that the vertical and horizontal seams are tightly lapped, and the reliable sealing of seams and exposed connection points is very important. Only by ensuring that every line and every point is well sealed can the overall quality be guaranteed. d: Engineering cooperation: cooperate with the opening of the ceiling to close and seal to ensure the progress of the entire project. 6. Installation of partition wall panels: The production of panels is the same as that of the ceiling. Calculate the size and number of all wall panels according to the construction drawings, and prepare them in the factory for use in advance. When the conditions of the construction site are mature, immediately contact the construction site honestly. The board is in place, and the connection between the board and the board is required to be flat and the board seam is tight. According to the line of the line pipe, the line pipe is pre-buried and drilled. Installation of aluminum fittings. Install curved aluminum material on the wall and flower, wall and ground, and the corner before the wall to ensure that there is no dead angle and no screws on the surface. The joints between the aluminum fittings and the plates are sealed with three glues. 7. Doors and windows are installed according to the size of the door, and the materials are prepared in advance. Install on site according to the dimensions required by the drawings. Door and window accessories require accurate seaming, verticality of corners, reliable sealing, and reduce gaps between windows and window accessories.
Currently there is a global trend growing. People are more conscious about extraction machine and are seeking alternatives to traditional solutions.
should only be created by the very best CUSTOM SOLUTION SERVICES companies with the training, experience and know how about what is expected of them.
Establish a unique brand as PHARMA that cuts through the clutter, and you'll get you the capital you need to get moving.
While manufacturing CUSTOM SOLUTION SERVICES, we always pay attention to the technology and quality of the product.
The extraction machine CUSTOM SOLUTION SERVICES is an all-servo system capable of storing hundreds of extraction machine process parameters to provide custom extraction machine profiles for each extraction machine type and extraction machine configuration.