What are the contents of the experimental decoration design scheme? The design scheme of the laboratory decoration construction and construction of the standardized laboratory should be designed by professional and technical personnel, comprehensively considering and following the principle of people-oriented, in order to build a standardized laboratory and achieve the best use effect. 1. Early plans for laboratory decoration design. To do a good job in the preparation of pharma machinery decoration in advance, you must first have an overall idea, plan well, and then gradually pave the walls. How to decorate and design, what design style experimental furniture, lighting fixtures, curtain fabrics, etc. to choose. 2. The division of the internal structure of the laboratory. The indoor air of the chemical laboratory, because the indoor space has been divided, should be laid out based on the convenience and effectiveness of the internal structure when the page is solved, the decoration design layout, and the furniture setting. According to the application function of the laboratory, it can be roughly divided into: preparation room (or pre-solution room), analysis room, pharma machinery room, balance room, microbial strain room (or purification room), storage room, etc. 3. decoration should take into account the mutual cooperation between color and materials. The basic colors are defined according to the overall design concept, and the configuration and mutual cooperation of different colors should be fully considered, such as high, cold, and warm favorites, and some small objects with high chroma are placed to facilitate orderly arrangement. The selection of each material and the furnishings and design of furniture must consider the long-term visual comfort of people, and even consider the characteristics of contact with the skin. It must conform to the basic principles of safety and environmental protection and the basic principles of ergonomics. Color and light have a very close relationship with each other, and careful consideration is required when selecting colors and raw materials in the formulation. 4. The layout of the laboratory. 1) The laboratory should use frame shear walls, which is conducive to the effective layout of the laboratory; 2). The fire protection level of the chemical laboratory cannot be lower than the second level, and the setting of fire protection equipment must comply with the design standards of relevant national building fire protection codes . 3). The seismic fortification category planned by the laboratory shall not be lower than Class B. 4). It conforms to the natural environment regulations of the laboratory, is unique, has a sense of modern science and technology, and shows the characteristics of the enterprise's field, work ideas and unique design style. 5). The floor material of the laboratory with special requirements such as cleanliness level, pressure difference, constant temperature and humidity pharma machinery, etc. should also meet the overall gap-free regulations. 6). The laboratory equipped with the cache room (including the complex laboratory pharma machinery of the cleaning laboratory, the microbiology laboratory and other units) should be set up with a concealed machine equipment door, and the same test equipment, especially the equipment. 7). The laboratory walls should be used building decoration materials with low surface adsorption, which is conducive to cleaning. 8). The road surface of the laboratory should be corrosion-resistant, wear-resistant, non-slip, and easy-to-clean building decoration materials. 9). Stained glass should not be used for laboratory window sash to prevent color vision discrimination deviation during the test. For laboratories with light blocking regulations, physical shielding measures should be adopted. 10). The common raw materials for interior decoration should be made of fire-resistant and flame-retardant materials as much as possible, and must be medium and high-end products. Environmental protection regulations should be considered, and the certification of compliance should be ensured. Samples or samples are given before purchase and can be carried out after the tenderer determines. , All over the country. Wall thickness. Ceiling ceiling pipe. The hole in the wire slot must be strictly sealed, and the actual effect of the decorative design must be contemporary, fashionable and beautiful.
At a time when technology is essential for CUSTOM SOLUTION SERVICES, ensuring that it works in a symbiotic way with your human employees is key.
SUZHOU PHARMA MACHINERY CO.,LTD. will be known for our leadership edge, through our passion for high standards, our respect for diversity and our commitment to create exceptional opportunities for professional growth so that associates can fulfill their highest potential.
To offer abundant options of product is an important factor to a company, such as CUSTOM SOLUTION SERVICESextraction machine to afford high-quality products for customers.
The only cardinal rule with adding animation is to keep high-quality on CUSTOM SOLUTION SERVICES.
Millions of women across the world suffer from extraction machine. Are you also one of them who suffer from acne problem? now you will see some hope in SUZHOU PHARMA MACHINERY CO.,LTD.'s offer of . Click PHARMA MACHINERY to know more.