In recent years, Dongguan dust-free workshops have been favored by more and more companies because of their clean indoor environment and low cost. Many companies that have not installed dust-free workshops do not know what preparations should be made before construction. What is the construction procedure of the purification engineering company? Today, I will tell you about it. The construction period transferred to the dust-free pharmaceutical cleanroom project from the construction preparation period is the period that constitutes the project entity. The reasonable organization of the construction procedure will play a serious and key role, affecting whether it can achieve multiplier effect with half the effort. The electrical equipment, wiring system, and electrical equipment of the clean room project have common rules for the organization of construction procedures and their own characteristics. (1) Preparatory work for construction 1. Equipment, utensils, and materials on-site inspection, specification and model verification, and appearance inspection. 2. Confirm the conditions for the construction of the dust-free pharmaceutical cleanroom in Dongguan, and determine whether the civil construction can cause pollution or damage to the electrical engineering during the installation of the equipment and after the installation of the equipment. 3. Check and review the dimensions of the clean room. 4. Construction safety measures are in place. (2) Construction procedures of electrical equipment 1. Complete set of power distribution cabinet (switch cabinet) equipment and equipment sequence: open the box to check one and two transfer, one equipment fixing, one busbar installation, one and two small line connection, one experiment adjustment, one power transmission operation inspection. 2. Transformer construction sequence: Check out the equipment, check the secondary transfer of the transformer, stabilize the transformer, install the accessories, check the transformer and explain the experiment, check before the power transmission, and check the operation of the power transmission. 3. The construction procedure of the power and lighting distribution box for surface installation: bracket manufacturing equipment, distribution box equipment, fixation, wire connection, inspection before power transmission, and power transmission operation. 4. Concealed power and lighting distribution box construction procedures: The distribution box equipment is fixed, one wire is connected, one is checked before the power is sent, and one is run. (3) Construction procedures of wiring system 1. Explicit piping construction procedures: measurement and positioning, bracket manufacturing equipment, box fixing, conduit prefabrication, conduit connection, grounding wire jumper, and painting. 2. Concealed pipe laying construction procedures: measurement and positioning, pre-buried conduit, box fixation, conduit connection and fixation, grounding bridge connection, and painting. 3. In-pipe threading construction procedure: selection of wires, pigging, threading of lead wires, wire release and wire breakage, binding of wire and lead wire, release of retaining ring, wire threading, wire connection, crimping and crimping cap, line inspection, insulation test . 4. Construction procedure of wiring slot wiring: measuring and positioning, manufacturing a bracket, preparing a wiring slot equipment, connecting a ground wire, connecting the wiring in the slot, and testing the line. 5. Wire cable wiring construction procedures: measurement and positioning, support manufacturing, support preparation, steel cable manufacturing, steel cable equipment, steel cable grounding, wire laying, wire connection, line testing, and line transmission. 6. Porcelain bottle wiring construction procedures: measurement and positioning, support manufacturing, support equipment, porcelain bottle equipment, wire laying, wire binding, wire connection, line testing, and line transmission. 7. The process of closing the plug-in busbar equipment: check the equipment points, manufacture and equipment of the bracket, close the plug-in busbar equipment, insulation test and power transmission inspection. 8. Cable laying construction procedures: cable inspection - cable transfer - cable insulation measurement - cable reel erection cable laying - hanging symbol - quality inspection. (4) Construction procedures for electrical equipment 1. Construction procedures for power equipment: inspection of equipment out of the box - inspection before using the equipment - motor equipment wiring - motor drying - control, maintenance and starting equipment - inspection before power transmission - power transmission operation . 2. Lighting equipment construction procedures: unpacking the lamps and inspecting one lamp assembly, one lamp equipment wiring, one inspection before power transmission, one power transmission operation. The above points are some experiences of preparation and implementation of the Dongguan dust-free workshop project provided by Fengyao before construction. I hope it can help you.
SUZHOU PHARMA MACHINERY CO.,LTD. continued to crave a more intense, personalized workout experience.
If CUSTOM SOLUTION SERVICES isn't meeting your needs, or you just want to see what else is out there, check out these content monitoring alternatives PHARMA MACHINERY.
SUZHOU PHARMA MACHINERY CO.,LTD. prepares for every aspect of running a business, and this includes developing a sound understanding and ability to manage the financial aspects of our company, including financial analysis, taxes and budgeting.